[1]
Fadli Perdana Yuda, Muhammad Ihsan Hamdy, Harpito, Suherman and Rika Taslim 2024. ANALISIS PEMELIHARAAN MESIN POMPA PULP MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE. JURNAL PERANGKAT LUNAK. 6, 1 (Feb. 2024), 117-127. DOI:https://doi.org/10.32520/jupel.v6i1.3033.